Implantation of Campinas Ring Road (SP-083) Stretch between Souzas and km 87 of SP 330 Length: 11 km Leveling: 1.5 million m3 Hot mix asphalt concrete: 50.420 t Bridges: 14 (total 720 m) From 21/01/1991 to 30/06/1994 and 09/03/2000 to 09/07/2001
More images
|
|
Viaoeste Length: 181 km Leveling: 7 million m3 Hot mix asphalt concrete: 225 tsnd ton Bridges: 44 Cowan’s participation: 23.75% Concession: from 1998 to 2004
More images
|
|
Urbanization Services in Contagem/MG (CUCO) From 1/10/1991 to 31/12/1993 Length: Reinforced concrete gallery: 2.78 km Canalization of stream: 9,10 km Sanitary Avenue: 6,72 km Leveling: 1.6 million m3 Hot mix asphalt concrete: 5 tsnd t From 10/1991 to 12/1993
More images
|
|
Jacu Pêssego Ring Road Work began: 1994 Pavement: 10.2 km Canalization of stream: 3.7 km Leveling: 650 tsnd m3 Hot mix asphalt concrete: 25 tsnd t Bridges: 2 (total 2,100 m)
More images
|
|
Linha Verde MG-010 Length: 22 km leveling: 1.6 million m3 Hot mix asphalt concrete: 125,000 t Rigid pavement: 20.000 m3 Bridges: 6 units Total span / bridges: 628 m Underpass: 1 unit Total length / underpass: 9 m Footbridges : 10 units Total span / footbridges: 2,400 m Rigid Barrier (New Jersey): 12,200 m From 2005 to 2007